This is an analysis on the effectiveness and efficiency of the design and planning process for the Phase I Towerside District Stormwater System occurring between 2013-2016. Also included are proposed adjustments and recommendations to improve the design, planning, contractual and policy process on future projects. This project builds on the existing Green 4th Street concept design study in the heart of the Towerside Innovation District. This is a continuation of MWMO efforts, to utilize an integrated systems based approach to manage stormwater as an asset in a fully developed urban setting.

Authors

Bruce Jacobson; Dan Kalmon, MWMO; Nathan Campeau, Barr Engineering

(Prepared by: Anne Rykken)

Suggested Citation

Mississippi Watershed Management Organization. (2018). Towerside District Stormwater System Phase 1 Report. MWMO Watershed Bulletin 2018-3. 39 pp.